1. Control/verify/calibration master sample and limit sample
2. Control the change ECN/ECO/VE
- Control all ECN/ECO information and lead IPQC technician/leader to control ECO/ECN by assign and follow up for 1st SN implement the change
- Confirm if ECO change need to run verify build or not
- Conduct continuous improvement activities for ECO/ECN control
- Follow up ECO/VE change on pilot product to verify the risk of the change
- Issue list summary and review until issue close for ECO/VE
- Review the ECO/VE with NPI
3. FMEA/QCP/IPQC checklist update reflect to the change
4. Ongoing Reliability Test failure analysis and drive improvement action
- Analyze the ORT failure to define the root cause
- Work with quality ENG to take the improvement action and monitor the effectiveness
5. Improvement activities relate to function tester at production line
6. Other task that can be assign by supervisor
Working Location: Dau Giay IZ, Thong Nhat, Dong Nai ( We provide shuttle bus)
Kết nối với chúng tôi. Vì sao?
Đồng Nai
Lương: Lương thỏa thuận